Thứ 3, 8/1/2008 9: 21: 15 A.M

Construction survey, technical design, cost estimation and general cost estimation
Technical design drawing, cost estimation and general cost estimation for Drainage in 25C road – Nhon Trach District, Dong Nai Province

  Details

Prepare feasibility study report, technical and basic design drawing, prepare and assess tender documents for the package TV2-TP2 (39 area of low-income area outside Tan Hoa – Lo Gom catchment )-WB funded.

  Details

Prepare technical design and general cost estimation for Water supply system in Hiep Hoa ward, Bien Hoa Province

  Details

Prepare technical design and general cost estimation for DN400, DN500 Long Son - Tan Thanh Water Transmission Pipeline, Vung Tau Province

  Details

Topography and geological survey, technical design drawing and general cost estimation for water supply System in Hoa Hiep ward, Xuyen Moc district, Ba Ria – Vung Tau province.

  Details

Page2 to 6 (in 28 service)Page: [<<] 1 2 3 4 5 6 [>>] [>]

   
 
   Online :  17
   Total Online :  1461351
 
Saigon Water, Environment And Infrastructure Joint Stock Company (SAIGON WEICO)
Address: 179 Dinh Tien Hoang St., DaKao Ward, District 1, HCMC
Tel: (84-28) 3820 6090       Fax: (84-28) 3820 6090
© Copyright . SAIGON WEICO. 2008. All rights reserved.