Thứ 3, 8/1/2008 9: 21: 15 A.M

Construction Supervision for Construction of South Binh Duong solid waste treatment complex- package LCB 2.2 construct four transmission station ( Thu Dau Mot, Di An, Lai Thieu, Thuan Giao
 


 PROJECT OTHER  


Construction Supervision for Construction of South Binh Duong solid waste treatment complex- package LCB 2.2 construct four transmission station ( Thu Dau Mot, Di An, Lai Thieu, Thuan Giao  
Construction Supervision for Construction of Primary and Secondary pipelines network in Binh Thanh, Go Vap, Phu Nhuan, Tan Binh District and District 10, receive and consume water from two BOT projects : Binh An - LDE (phase 1  
Construction Supervision for Construction of Primary and Secondary pipelines network in District 9, receive and consume water from Thu Duc BOO project with capacity 300.000m3/day  
Construction Supervision for Primary pipeline installation project on Thoi Hoa street, HCMC  
Construction Supervision for Primary pipeline installation project on Nguyen Huu Tri street , HCMC  
Construction Supervision for Sub-project 3 "Clean water conveyance pipeline D1800-2000 in Tan Hiep - An Suong - Tay Thanh  
Construction Supervision for Drainage system of level 3 in Da Nang city (Package 39)  
Construction Supervision for Package 3 : Construction of Clean Water Supply system for Can Gio District  
Construction Supervision for Installation of secondary pipeline on Hau Giang Street (Lo Gom –Nhan Tinh  
Construction Supervision for Installation of primary pipeline D600 on Truong Son highway, Thu Duc province  
   
 
   Online :  25
   Total Online :  1461469
 
Saigon Water, Environment And Infrastructure Joint Stock Company (SAIGON WEICO)
Address: 179 Dinh Tien Hoang St., DaKao Ward, District 1, HCMC
Tel: (84-28) 3820 6090       Fax: (84-28) 3820 6090
© Copyright . SAIGON WEICO. 2008. All rights reserved.