Thứ 3, 8/1/2008 9: 21: 15 A.M

Prepare investment project for Wastewater treatment plant Project of Minh Hung III Industrial Park, capacity 10.000m3/day
 


 PROJECT OTHER  


Prepare investment project for Wastewater treatment plant Project of Minh Hung III Industrial Park, capacity 10.000m3/day  
Prepare investment project & topography and geological survey for Drainage system from area No.4 to Suoi Da – Trang Bom town  
Prepare investment project for Project of rural clean water, Ba Ria - Vung Tau province  
Geological survey and prepare economic and technical report for Water Supply System in Tan Long commune, Phu Giao Disctrict  
Prepare economic and technical report for Water Supply System, Lo 25 Commune , Thong Nhat District  
Prepare economic and technical report for Installation of D300 pipeline on Thanh Thai Street  
Prepare investment project & topography and geological survey for Sludge treatment plant of Binh An water plant, Binh Duong province  
Prepare economic and technical report for upgrading the capacity of D200 pip line from Hon Heo booster pump station to Ba Hon bridge, Kien Luong district, Kien Giang province  
Prepare investment project & topography and geological survey for Water treatment plant inner rubber park in Dong Nai province, capacity 15.000m3/d  
Prepare adjusted document for investment project Extension of Thien Tan Water Supply System (phase 2, capacity from 100.000m3/d to 200.000m3/d)  
   
 
   Online :  3
   Total Online :  1461405
 
Saigon Water, Environment And Infrastructure Joint Stock Company (SAIGON WEICO)
Address: 179 Dinh Tien Hoang St., DaKao Ward, District 1, HCMC
Tel: (84-28) 3820 6090       Fax: (84-28) 3820 6090
© Copyright . SAIGON WEICO. 2008. All rights reserved.