Thứ 3, 8/1/2008 9: 21: 15 A.M

Prepare investment project for Đa Ban lake Water supply system with capacity of 20,000 m3/day
 


 PROJECT OTHER  


Prepare investment project for Đa Ban lake Water supply system with capacity of 20,000 m3/day  
Prepare topography and geological survey and investment project for drainage and sewage System in Phuoc Dan town, Ninh Thuan province - Belgium funded  
Prepare feasibility study report for Water supply project in Thua Thien Hue province – ADB funded  
Prepare investment project for Wastewater treatment plant Project of Minh Hung III Industrial Park, capacity 10.000m3/day  
Prepare investment project & topography and geological survey for Drainage system from area No.4 to Suoi Da – Trang Bom town  
Prepare investment project for Project of rural clean water, Ba Ria - Vung Tau province  
Geological survey and prepare economic and technical report for Water Supply System in Tan Long commune, Phu Giao Disctrict  
Prepare economic and technical report for Water Supply System, Lo 25 Commune , Thong Nhat District  
Prepare economic and technical report for Installation of D300 pipeline on Thanh Thai Street  
Prepare investment project & topography and geological survey for Sludge treatment plant of Binh An water plant, Binh Duong province  
   
 
   Online :  25
   Total Online :  1461470
 
Saigon Water, Environment And Infrastructure Joint Stock Company (SAIGON WEICO)
Address: 179 Dinh Tien Hoang St., DaKao Ward, District 1, HCMC
Tel: (84-28) 3820 6090       Fax: (84-28) 3820 6090
© Copyright . SAIGON WEICO. 2008. All rights reserved.