Thứ 3, 8/1/2008 9: 21: 15 A.M

Survey and prepare investment project for An Tay water supply plant and water supply system with capacity of 30.000m3/day
 


 PROJECT OTHER  


Survey and prepare investment project for An Tay water supply plant and water supply system with capacity of 30.000m3/day  
Topographical and geological, economic and social Survey, prepare the feasibility study report, detailed design for Vietnam urban upgrading Project - Can Tho subproject-WB funded  
Prepare geological survey, economical and technical report for Construction of water supply station in Long Toan commune, Duyen Hai District, Tra Vinh Province  
Prepare investment project for Đa Ban lake Water supply system with capacity of 20,000 m3/day  
Prepare topography and geological survey and investment project for drainage and sewage System in Phuoc Dan town, Ninh Thuan province - Belgium funded  
Prepare feasibility study report for Water supply project in Thua Thien Hue province – ADB funded  
Prepare investment project for Wastewater treatment plant Project of Minh Hung III Industrial Park, capacity 10.000m3/day  
Prepare investment project & topography and geological survey for Drainage system from area No.4 to Suoi Da – Trang Bom town  
Prepare investment project for Project of rural clean water, Ba Ria - Vung Tau province  
Geological survey and prepare economic and technical report for Water Supply System in Tan Long commune, Phu Giao Disctrict  
   
 
   Online :  26
   Total Online :  1461442
 
Saigon Water, Environment And Infrastructure Joint Stock Company (SAIGON WEICO)
Address: 179 Dinh Tien Hoang St., DaKao Ward, District 1, HCMC
Tel: (84-28) 3820 6090       Fax: (84-28) 3820 6090
© Copyright . SAIGON WEICO. 2008. All rights reserved.